Preparation for sheet metal deburring and chamfering! Shengxingli mechanical deburring machine series

Source:Jinhua Shengxingli Machinery Manufacturing Co., Ltd.Release time:2024-07-17

Sheet metal chamfering is a common process in machining, its purpose is to remove the burr on the edge of the part and improve the smoothness and beauty of the part. The use of chamfering machine is of great significance to improve production efficiency and processing quality. This article will introduce the sheet metal chamfering test process in detail to ensure the normal operation of the equipment and the safety of production.

Before the sheet metal chamfering test machine, you need to make the following preparations:

1. Check the equipment: ensure that the chamfer is in good working condition, including whether the power supply, air pressure, lubrication and other systems are normal.

2. Prepare tools: Prepare the required tools and measuring tools, such as cutting tools, fixtures, measuring ruler, etc.

3. Clean up the site: Clean up the work area to ensure that there is no debris and garbage.

4. Understand drawings: familiar with sheet metal drawings, understand the size, shape and material of parts and other information.

Second, the test process

1. Start the device: Turn on the power supply and air pressure system to ensure the normal operation of the device.

2. Install abrasive: Select the appropriate abrasive according to the size and shape of the part, and install it on the knife holder of the chamfering machine.

3. Adjust parameters: According to the material and processing requirements of the parts, adjust the parameters of the equipment, such as feed speed, cutting depth, etc.

4. Test cutting: During the test cutting process, observe the cutting situation, check whether the tool is suitable and whether the equipment is running normally.

5. Measure the size: After the test cutting, use the measuring tool to measure the size of the parts and check whether it meets the requirements of the drawing.

6. Adjust parameters: Adjust the parameters of the equipment according to the measurement results to ensure the processing quality of the parts.

7. Repeat test machine: repeat the above steps until the processing quality of the parts meets the requirements.

Third, precautions

1. In the process of testing, always pay attention to safety to avoid accidents.

2. When adjusting parameters, adjust according to the actual situation, do not blindly pursue processing efficiency and ignore processing quality.

3. When measuring parts with a measuring tool, ensure the accuracy and reliability of the measuring tool.

4. In the process of grinding, it is necessary to keep the sharpness and stability of the abrasive to avoid breaking or sticking.

5. In the use of chamfer, regular maintenance and maintenance should be carried out to ensure the normal operation and service life of the equipment.

In short, the sheet metal chamfering test process is an important link to ensure the normal operation of equipment and production safety. In the process of testing the machine, it is necessary to make preparations carefully, strictly abide by the operating procedures, pay attention to safety matters and solve problems in time. Only in this way can we improve production efficiency and processing quality, reduce costs and ensure that the quality and safety of products meet the requirements.

主站蜘蛛池模板: 日韩高清一级毛片| 亚洲AV国产福利精品在现观看| 亚洲国产成人久久一区www妖精| 亚洲经典在线观看| 成人免费视频在线| 亚洲欧美日韩国产色另类| 午夜国产福利在线观看| 午夜宅宅网| 桃色网站入口| 亚洲 综合 自拍 精品 在线| 九九热这里只有国产精品| 水蜜桃一区一区三全集| 男男h开荤粗肉h文1v1| 在线视频一区二区三区在线播放| 天堂在线免费视频| 草莓国产视频免费观看| 日本色综合网| 秋霞最新高清无码鲁丝片| 国产精品久久久久影院嫩草| 亚洲免费中文| 野花韩国高清完整版在线观看5| 在线av色| 亚洲日韩精品欧美一区二区| 最新69国产成人精品视频69| 婷婷色五月另类综合视频| 日韩高清中文字幕| 日韩三级一区二区三区| 日韩午夜| 超碰免费视频caoporn| 性夜a爽黄爽| 亚洲zscs综合网站| 天堂日韩| 青青国产在线视频| 亚洲欧美国产精品久久久| 色小说在线| 一二三四高清中文版视频| 欧美美女一区二区三区| 天堂男人网| 羽月希被黑人吃奶dasd585| 1788福利视频在视频线| 国产精品久久久久久免费字体|